Sourcing building material from Foshan China
China Dragon Sourcing Tour/Agent, WhatsApp: +86 131 4470 2935
China Dragon Sourcing Tour/Agent, WhatsApp: +86 131 4470 2935
Foshan, China, remains the world's premier hub for building material sourcing in 2026, particularly for ceramics, furniture, and sanitary ware. The city accounts for over 50% of China's ceramic tile production and roughly 25% of global output.
Key Sourcing Categories and Locations
Foshan is organized into specialized industrial clusters that allow buyers to compare thousands of suppliers in close proximity:
Ceramics and Tiles: Centered in the Chancheng and Nanzhuang districts. Top venues include:
China Ceramics City (CCC): A premium mall for high-end tiles and bathroom fixtures.
Huaxia Ceramics City: A massive wholesale hub for bulk tile orders.
Furniture: Located primarily in Shunde (Lecong and Longjiang), known as "Furniture City".
Louvre International Furniture Mall: Famous for high-end and luxury furniture.
Sunlink Furniture Market: Split into North and South areas, offering a mix of mid-to-high-range options.
Sanitary Ware & Kitchen: Foshan is a leader in high-end bathroom brands (e.g., JOMOO, HEGII) and custom cabinetry.
Casa Ceramics and Sanitarywares Mall: Dedicated to bathroom and kitchen solutions.
Major 2026 Trade Fairs
Attending fairs is the most efficient way to meet verified manufacturers face-to-face:
CeramBath (44th China International Ceramic & Bathroom Fair): Scheduled for April 18–23, 2026 at the CCC and Huaxia venues.
Canton Fair (139th Spring Session): Located in nearby Guangzhou. Phase 2 (April 23–27, 2026) focuses on home products, furniture, and building materials.
CBD Fair (China Building Decoration Fair): To be held in Guangzhou from July 8–11, 2026.
The Sourcing Process (2026 Roadmap)
Preparation: Before traveling, prepare detailed floor plans, material lists, and "mood boards".
Visa Requirements: For business visits, apply for a Category M Visa. You will need an official invitation letter from a trade partner or fair organizer.
On-site Logistics: Fly into Guangzhou Baiyun International Airport; Foshan is approximately a 1-hour drive away. Consider hiring a local sourcing agent to handle translation, price negotiation (typically 20% savings), and quality inspections.
Production and Shipping:
Timelines: Tiles typically take 7–15 days to produce, while custom kitchen cabinets can take 30–60 days.
Shipping: Sea freight times for 2026 are estimated at 15 days to Australia, 30 days to the Middle East, and 45 days to the USA.
Expert Tips for 2026
Verify Compliance: Ensure materials meet your country's specific building codes (e.g., fire ratings for the UK or USA).
MOQ Management: While factory-direct prices are lower, they often require Minimum Order Quantities (MOQs) of 5–100 units depending on the product.
Consolidation: Use a local warehouse to consolidate orders from different suppliers into a single container (FCL - Full Container Load) to minimize shipping costs.
Written by Sony Song, Jan 8th 2026